Difference between revisions of "Thorn Valley"

From ASP Wiki
Jump to navigation Jump to search
m
m (name background)
Line 1: Line 1:
 
<!-- metadesc>Thorn Valley is the working name for the site of the initial PodHomes construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018.</metadesc -->
 
<!-- metadesc>Thorn Valley is the working name for the site of the initial PodHomes construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018.</metadesc -->
[[Thorn Valley]] is the working name for the site of the initial [[PodHomes]] construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018. It is located in the [[wikipedia:Northern_Basin_and_Range_ecoregion#High_Lava_Plains_(80g)|High Lava Plains]] ecoregion.
+
[[Thorn Valley]] is the [[/name|working name]] for the site of the initial [[PodHomes]] construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018. It is located in the [[wikipedia:Northern_Basin_and_Range_ecoregion#High_Lava_Plains_(80g)|High Lava Plains]] ecoregion.
  
 
The general plan is to keep some PodHomes on-site to house the first residents, and later build more permanent structures.
 
The general plan is to keep some PodHomes on-site to house the first residents, and later build more permanent structures.

Revision as of 15:45, 8 December 2019

Thorn Valley is the working name for the site of the initial PodHomes construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018. It is located in the High Lava Plains ecoregion.

The general plan is to keep some PodHomes on-site to house the first residents, and later build more permanent structures.

Status

November 2019

The site currently has no facilities, and is out of range of any cell towers; the nearest signals are blocked by hills. Setting up some kind of internet connectivity is a priority, along with sanitary facilities and sustainable electricity generation.

October 2019

Photos

July 20, 2019

2019-07-20-tessa-1.jpg 2019-07-20-tessa-2.jpg 2019-07-20-tessa-5.jpg

2019-07-20-tessa-4.jpg 2019-07-20-tessa-3.jpg