Difference between revisions of "Thorn Valley"
Jump to navigation
Jump to search
m |
(liberapay) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
<!-- metadesc>Thorn Valley is the working name for the site of the initial PodHomes construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018.</metadesc --> | <!-- metadesc>Thorn Valley is the working name for the site of the initial PodHomes construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018.</metadesc --> | ||
− | [[Thorn Valley]] is the working name for the site of the initial [[PodHomes]] construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018. It is located in the [[wikipedia:Northern_Basin_and_Range_ecoregion#High_Lava_Plains_(80g)|High Lava Plains]] ecoregion. | + | [[Thorn Valley]] is the [[/name|working name]] for the site of the initial [[PodHomes]] construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018. It is located in the [[wikipedia:Northern_Basin_and_Range_ecoregion#High_Lava_Plains_(80g)|High Lava Plains]] ecoregion. |
The general plan is to keep some PodHomes on-site to house the first residents, and later build more permanent structures. | The general plan is to keep some PodHomes on-site to house the first residents, and later build more permanent structures. | ||
+ | |||
+ | The [https://liberapay.com/tvrp/ liberapay page] has more information. | ||
==Status== | ==Status== | ||
===November 2019=== | ===November 2019=== |
Latest revision as of 17:39, 8 December 2019
Thorn Valley is the working name for the site of the initial PodHomes construction facility and residential area. It is located in the badlands of southern Oregon, on 20 acres Tessa purchased in 2018. It is located in the High Lava Plains ecoregion.
The general plan is to keep some PodHomes on-site to house the first residents, and later build more permanent structures.
The liberapay page has more information.
Status
November 2019
The site currently has no facilities, and is out of range of any cell towers; the nearest signals are blocked by hills. Setting up some kind of internet connectivity is a priority, along with sanitary facilities and sustainable electricity generation.
October 2019
- status/2019/10/19: Last year, we acquired land...